Anything else — call (478) 836-3485.
Either a Single Mill agreement, covering one site, or a Multiple Mills agreement across three or more independent mills. Both buy the same work. The difference is what the agreement carries around it.
Inspections are priced per digester inspected — $18,000 under Single Mill, $16,000 under Multiple Mills. The coating itself is quoted after survey, because digester size, condition and use decide the area and how it is built up.
Two items sit outside the rate in both cases: travel and board at 48 hours a visit, and scaffolding where the vessel needs it. You see those figures before you sign.
That is the whole of it. We used to sell turnaround guarantees, price holds and a volume discount as separate products on top. We don’t any more. The paperwork had started to outlast the digesters.
Four things, and they are all aimed at capital planning rather than a single outage.
A lower inspection rate — $16,000 per digester rather than $18,000, on every vessel in the group.
Advanced reporting on projected costs — what each vessel in the group is likely to need, and roughly when, so the spend lands in a budget cycle instead of a surprise.
Capital funding can be locked earlier, which is what makes the materials lock below possible.
Partial PO installments, or quarterly and bi-annual POs, up to 80% of projected cost. You choose the cadence and how much to pre-fund.
It needs three or more independent mills. One site with several digesters is still a Single Mill agreement, however many vessels it has.
Pre-funding is a facility, not a fixed schedule. You set three things:
Cadence — quarterly or bi-annual. Scope — materials only, or the full service cost. Share — anywhere from 30% to 80% of projected cost.
Whatever is not pre-funded falls due when the work is carried out, in the ordinary way. Unused funds roll into contract renewal rather than being forfeited.
Because each contract sets its own cadence and share, the payment schedule is written into that contract rather than fixed here. Nothing on this page commits you to a term.
Yes, under a Multiple Mills agreement. The lock attaches at the point capital funding is committed — not at signature, and not at survey.
Locked materials will not increase by more than 10% of the original price. That ceiling is ours to carry, not yours.
It runs until next service or two years from that date, whichever is sooner. If an outage is deferred beyond that, materials are repriced at the time.
The materials it covers are named in your multi-mill services agreement. Labor, travel and scaffolding are not covered and are quoted at the time, as they always were.
We stand behind how the coating was applied — that it went on to the specified thickness, with the specified coverage and adhesion, over the area agreed at survey. If it debonds, thins or fails to cover because of our workmanship, we put it right.
What it does not cover is damage to a coating that was applied correctly:
We record the operating envelope at survey and ask you to sign it, so neither side is arguing about what normal looked like two years later.
Yes. Sites rarely need the same thing in the same year — one vessel wants coating now, another only wants reading this time round.
Pick inspection, coating, or both, per mill. Call us on (478) 836-3485 and we’ll build it as one proposal with different scopes per site. The Multiple Mills threshold counts across the whole group.
Quotes by phone
Every digester is different. Tell us the vessel and we’ll give you the scope, the outage window and the price.
(478) 836-3485Mon–Fri · Roberta, Georgia
← Back to twinwirearc.com